日本丰满白嫩BBWBBW_日韩无码一区_欧洲精品码一区二区三区免费看_欧美日韩精品亚洲综合中文一区_午夜福利不卡片在线播放 _国产欧美一区二区三区精品蜜桃_免费毛片一区二区三区久久久_国产精品欧美复古日韩经典在线

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.


财经| 雷波县| 庆城县| 博兴县| 永州市| 丰台区| 望江县| 灵寿县| 绍兴市| 喀喇| 海盐县| 水富县| 南漳县| 得荣县| 喀喇| 阜新市| 五常市| 北宁市| 盘锦市| 宝应县| 宜阳县| 招远市| 涡阳县| 曲周县| 丘北县| 宁津县| 渑池县| 运城市| 西昌市| 阆中市| 仪征市| 双柏县| 怀仁县| 获嘉县| 迁安市| 长岛县| 罗江县| 泰兴市| 南部县| 尖扎县| 大同市|