日本丰满白嫩BBWBBW_日韩无码一区_欧洲精品码一区二区三区免费看_欧美日韩精品亚洲综合中文一区_午夜福利不卡片在线播放 _国产欧美一区二区三区精品蜜桃_免费毛片一区二区三区久久久_国产精品欧美复古日韩经典在线

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator installation precautions

皮囊式蓄能器2.jpg

 

The accumulator should be installed at a convenient location for inspection and maintenance. When used to absorb shock and pulsation, the accumulator should be close to the vibration source, and should be installed in the place where the impact is easy. The installation position should be away from the heat source to prevent the system pressure from rising due to the thermal expansion of the gas.


The accumulator must be securely fastened but not allowed to be welded to the main unit and should be securely supported on the bracket or on the wall. When the diameter ratio is too large, hoop reinforcement should also be provided.


In principle, the capsule accumulator should be installed vertically downwards. When tilting or horizontally mounted, the bladder is in contact with the shell by buoyancy, which hinders normal telescopic operation, accelerates the damage of the bladder, and reduces the risk of accumulator function. . Therefore, the method of tilting or horizontal mounting is generally not used. There are no special installation requirements for diaphragm accumulators, and the oil ports can be installed vertically, tilted or horizontally downwards.


A check valve should be installed between the pump and the accumulator to prevent the oil in the accumulator from flowing back into the pump and returning to the tank when the pump stops working, causing an accident.


天峻县| 嘉黎县| 陇川县| 九龙县| 禹城市| 浑源县| 芦溪县| 灵丘县| 黄浦区| 正宁县| 辽宁省| 临沭县| 革吉县| 达州市| 阿合奇县| 乌海市| 古交市| 宁晋县| 南皮县| 合江县| 辉南县| 吉木乃县| 壤塘县| 蒙阴县| 万荣县| 德江县| 仪征市| 丽江市| 营口市| 乐昌市| 台东县| 白山市| 长沙县| 三原县| 河津市| 神农架林区| 桦川县| 浮梁县| 大庆市| 额尔古纳市| 德格县|